Many medium voltage termination failures can be traced back to errors in selection, cable preparation or installation rather than flaws in the accessory itself. That is why best practice matters just as much as the product you buy.

Mistake 1: Choosing the Wrong Kit

Mismatch between the termination and the cable voltage, conductor size, or screen layout can cause performance problems even before it is used. Making sure to order the right selection table and verify cable specifications before ordering is among the most effective ways to eliminate unnecessary risk.

Mistake 2: Poor Cable Preparation

Incorrect removal of semicon, insulation damage and inaccurate dimensions are recurring causes of termination problems. Even a well-designed kit can fail if the cable has not been prepared cleanly and to the manufacturer’s specification.

Mistake 3: Weak Stress Control or Sealing

Stress control components, mastics and sealing elements all play an essential role in medium voltage performance. If they are omitted, fitted incorrectly or compressed unevenly, the system becomes more vulnerable to electrical stress and moisture ingress.

Mistake 4: Overheating Heat Shrink Components

Even heating is required in heat-shrink systems. The excessive heat may damage the insulation, or it may deform the components fitted whereas the insufficient heat may result in poor sealing or incomplete shrinkage.

Mistake 5: Ignoring Environmental Conditions

Using a termination outside its intended environment can shorten service life. Outdoor exposure, pollution, condensation and UV all need to be factored into the selection process, especially for higher-voltage installations.

Mistake 6: Lack of Training and Quality Checks

Workmanship is one of the biggest variables in MV termination performance. Trained installers, proper supervision and appropriate pre-energisation checks all help reduce the chance of faults, rework and in-service failure.