The programme integrated detailed theoretical frameworks with hands-on High Voltage installation practices, focusing on critical accessory installation techniques and interface control for 52kV and 66kV systems.
Training scope included:
- 52kV Termination Systems - Installation and positioning of termination skirts to ensure optimal creepage distance and environmental protection - Assembly and installation of earth leakage collectors and roll springs for effective stress control and shielding continuity
- 66kV Transition Joint Installation - Preparation and installation of braid connections onto paper-insulated lead sheath (PILC) cables, ensuring continuity and mechanical integrity - Application of insulating and conductive sleeves to manage electrical stress distribution at the interface -Outer sealing sleeve installation to provide environmental sealing and long-term ingress protection
With over 50 years of experience in the power cabling sector, Chris brings deep technical expertise across a wide range of cable constructions, jointing systems, and manufacturer-specific installation requirements used throughout UK and European transmission and distribution networks.
At Jointing Tech, our training is designed to reinforce best practice in stress grading, interface preparation, and installation consistency, key factors in reducing partial discharge risk and ensuring long-term asset reliability.
If you’re looking to enhance your team’s technical capability in MV/HV cable systems, our specialist training programmes can be tailored to your network requirements. Contact our Technical Training team for more information: bit.ly/43FUKIg